COMPLETED COMMERCIAL LEARN-TO-SWIM FACILITY

Turtle Tots Staffordshire

A completed commercial learn-to-swim facility delivered within a restricted building footprint, fully integrated into the surrounding structure and engineered for year-round teaching programmes.

Exterior building frontage with Turtle Tots signage

PROJECT OVERVIEW

Turtle Tots Staffordshire

Completed Commercial Learn-to-Swim Facility

Turtle Tots Staffordshire was a unique commercial learn-to-swim facility delivered within a restricted building footprint, requiring careful planning and close coordination with the principal contractor responsible for the wider development.

The Bunka Pool was fully integrated into the surrounding structure, creating a purpose-built teaching environment specifically designed for babies, young children and families. Every element of the installation was engineered to maximise operational efficiency while maintaining the highest standards of water quality, safety and long-term reliability.

From initial design through to commissioning, the complete project was successfully delivered in just four months and constructed in full accordance with PWTAG guidance, providing a premium commercial swimming facility capable of supporting year-round learn-to-swim programmes.

This project represents one of the first commercial installations of the Bunka MK1™ System, demonstrating Bunka’s ability to integrate structural engineering, mechanical services, water treatment and environmental control into one complete commercial aquatic solution.

Main teaching pool at Turtle Tots Staffordshire

COMPLETED FACILITY PHOTOGRAPHY

Teaching, Team & Plant

Turtle Tots Staffordshire team in the teaching pool
Evening blue-lit pool photography
Water treatment monitoring equipment
Commercial plant room pipework and filtration
Completed facility pool interior with blue lighting

ENGINEERING & PLANT SPECIFICATION

Integrated Commercial Plant Room

The facility incorporates a fully integrated commercial plant room engineered for continuous professional operation, including:

Bunka MK1™ engineered commercial pool system

Fully integrated electrical control panel

Dual commercial filtration system

Dual commercial circulation pump system

Commercial UV water disinfection system

Kuntze automatic chemical dosing and water monitoring system

Heatstar commercial air handling unit (AHU)

Calorex high-performance air source heat pump (ASHP)

Backup electric boiler system

Automatic pump control system

Automatic water top-up system

Together these systems provide exceptional water quality, energy efficiency and operational reliability, ensuring the facility consistently meets the demands of a busy commercial learn-to-swim programme.

Key Project Information

Commercial Learn-to-Swim Facility

Staffordshire, United Kingdom

Completed

Bunka MK1™ Commercial Pool System

Build Time: 4 Months

Fully PWTAG Compliant

Bunka Pool fully integrated into surrounding structure

Premium commercial plant room

Automated water treatment and environmental control